By E-Mail
TAMIL NADU GENERATION AND DISTRIBUTION
CORPORATION LTD.
ADMINISTRATIVE BRANCH
From
Er. A. RAJA, B.E.,
F.I.E.,
Chief Engineer/
Personnel,
8th Floor, NPKRR
Maaligai,
144, Anna Salai,
Chennai - 600 002.
|
To
The Superintending
Engineer's concerned.
|
Letter
No.054614/348/G3/G31/2013-2, dated 27.07.2013.
Sir,
Sub:
|
Establishment
- Class III Service - Senior Draughtsman - Preparation of panel for promotion
to the post of Head Draughtsman - Suitability
Reports - called for - Regarding.
|
------
|
It is proposed to prepare a
panel of Senior Draughtsman for promotion to the post of Head Draughtsman for
the Crucial date 20.01.2013 to fill up the existing/future vacancies.
2. I request you to furnish 5
copies of the Suitability Reports of the Senior Draughtsman working under your
control (List of Names as per Annexure enclosed) in the FORMAT enclosed, so as
to reach this office ON OR BEFORE
16.08.2013 positively. The Letter
and FORMAT shall be signed by the S.E.s/C.E.s himself and not by any other
officers. In this connection, I am to
invite your attention to this office Circular Memo. No.068288/Adm.II/A2/97-1,
dated 12.06.1997 and request you to keep up the target date.
3. I also request you to furnish specifically
the details regarding the charges/ D.P. (framed/pendency/undergoing punishment)
as on 20.01.2013 alongwith other details.
……2
-
2 -
4. I also request you to furnish the particulars
strictly, as called for in the format.
If any item of the format having no remarks, it should be indicated as
"NIL".
5. If any of the employees as shown in a
particular circle, is not presently working in your circle, a report may be
sent without fail. If he had been
transferred from your circle to other circle, the S.E. concerned may be
addressed, together with the copy of this office reference (w.e.) with request
to furnish the report of the individual concerned directly, to this office.
6. The receipt of this letter with its
enclosures should be acknowledged in the first instance.
Encl.:
Annexure & Format.
|
Yours
faithfully,
Sd./- XXX
(R.
MURALI)
Personnel
Officer/ Panel
for
Chief Engineer/ Personnel
|
Copy
to the Chief Engineer/ Distribution/
Copy
to the Chief Engineer/
Copy
to the Assistant Personnel Officer/ M&C/ Adm. Branch
Copy
to G.14 Section.
Copy
to Stock file.
ANNEXURE
To the Letter
No.054614/348/G3/G31/2013-2, dated 27.07.2013
List of
names of Senior Draughtsman for Preparation of Panel for promotion to the post
of Head Draughtsman
Sl. No.
|
Name of
the Senior Draughtsman
|
Date of
Birth
|
Present
Circle
|
(1)
|
(2)
|
(3)
|
(4)
|
1.
|
M.R. Meera
|
12.12.1957
|
Chennai EDC/
West
|
2.
|
A. Amanullah
|
04.05.1960
|
Transmission-II/
Chennai
|
3.
|
A. Basheer
Ahamed Khan
|
29.11.1958
|
|
4.
|
K. Athikesavan
|
15.12.1959
|
Udumalpet EDC
|
5.
|
S. Rajendran
|
25.03.1959
|
GCC/ Trichy
|
6.
|
K.N.
Ramanathan
|
08.10.1962
|
M.T.P.S.
|
7.
|
R. Dilly
Ramesh
|
18.02.1959
|
T.T.P.S.
|
8.
|
N.A. Rafyee
|
30.04.1958
|
P&C/
|
9.
|
T. Ramamoorthy
|
15.05.1960
|
GCC-I/ Chennai
|
10.
|
B.
Suthanthiram
|
09.05.1958
|
GCC/
|
11.
|
V. Anandan
|
09.02.1961
|
P&C/
|
12.
|
P.
Vasanthakumar
|
18.06.1961
|
Kallakurichi
EDC
|
13.
|
A. Moorthy
|
18.08.1959
|
|
14.
|
S. Venkatraman
|
14.09.1961
|
|
15.
|
M. Sivakumar
|
08.03.1960
|
SE/Civil/ Hydro Project Circle/ Erode
|
16.
|
M. Paramasivam
|
14.07.1961
|
P&C/
|
17.
|
G. Gajendran
|
15.02.1960
|
GCC/
|
18.
|
T. Mariappan
|
19.05.1959
|
SE/Civil/ Hydro Project Circle/ Erode
|
19.
|
S. Martin
Devadoss
|
20.04.1961
|
GCC/Trichy
|
20.
|
V. Dharmarajan
|
08.04.1960
|
T.T.P.S.
|
21.
|
P. Manoharan
|
04.03.1957
|
SE/Operation/Salem
|
--2
- 2 –
22.
|
R. Sengodan
|
06.05.1958
|
GCC/Salem
|
23.
|
R. Nageswaran
|
19.05.1961
|
GCC/Coimbatore
|
24.
|
V. Ashokan
|
15.07.1956
|
Chennai EDC/
West
|
25.
|
P. Chinnadurai
|
05.03.1959
|
E.T.P.S.
|
26.
|
N.
Muralidharan
|
09.06.1959
|
GCC/
|
27.
|
K. Jeyakumar
|
05.03.1962
|
SE/Civil/ Hydro Project Circle/ Erode
|
28.
|
R.
Gnanasekaran
|
09.05.1959
|
GCC-I/ Chennai
|
29.
|
T. Palanivelu
|
04.03.1960
|
|
30.
|
B. Sekar
|
15.01.1960
|
M.T.P.S.
|
31.
|
M.
Kanagasabapathy
|
01.05.1957
|
CE/Disbn./Madurai
Region
|
32.
|
R. Gajendran
|
30.03.1958
|
Virudhunagar
EDC
|
33.
|
G. Muniraj
|
15.06.1959
|
GCC/
|
34.
|
V.
Essakkimuthu
|
27.06.1962
|
SE/Civil
Hydel/Chennai
|
35.
|
V. Padmanabhan
|
15.05.1961
|
|
36.
|
V. Kanakasabai
|
14.04.1957
|
E.T.P.S.
|
37.
|
V. Swaminathan
|
19.06.1961
|
Udumalpet EDC
|
38.
|
K. Nagaraj
|
29.12.1959
|
|
39.
|
S.
Leelakrishnan
|
04.03.1960
|
GCC/
|
40.
|
T. Karuppaiyan
|
01.05.1958
|
Perambalur EDC
|
41.
|
S. Prabhakaran
|
07.12.1960
|
GCC-I/ Chennai
|
42.
|
R. Baskar
|
12.05.1961
|
Namakkal EDC
|
43.
|
P. Shaik
Alavudeen
|
21.05.1962
|
Civil Design/
Chennai
|
44.
|
S.
Thiruvengadam
|
07.08.1959
|
Thanjavur EDC
|
45.
|
M. Nagalingam
|
09.01.1960
|
SE/P&C/Chennai
|
46.
|
M. Kannappan
|
12.05.1958
|
SE/MM-II/ Chennai
|
47.
|
N. Mohan
|
08.06.1959
|
SE/Hydro (Electrical)/Chennai
|
48.
|
R. Kamaraj
|
17.06.1959
|
Dindigul EDC
|
49.
|
M. Ragothaman
|
10.05.1958
|
Villupuram EDC
|
--3
- 3 –
50.
|
C. Krishna
|
13.01.1959
|
NCTPS Stage-II
|
51.
|
A. Shanmugam
|
19.08.1959
|
|
52.
|
G. Edward
Thodews
|
07.04.1957
|
Nilgiris EDC
|
53.
|
M.
Lakshmipathi
|
01.05.1960
|
|
54.
|
S. Karuppiah
|
14.07.1958
|
SE/APDRP/Chennai
|
55.
|
R. Loganathan
|
13.04.1961
|
Erode EDC
|
56.
|
K. Rajendran
|
10.05.1958
|
ETPS
|
57.
|
A. Somu
|
01.06.1958
|
GCC/
|
58.
|
B. Nawab John
|
07.02.1961
|
Cuddalore EDC
|
59.
|
G. Ramasamy
|
15.03.1959
|
GCC/Madurai
|
60.
|
K. Subramanian
|
21.01.1960
|
CDC-I/Chennai
|
61.
|
R. Rajendran
|
18.06.1961
|
Nagai EDC
|
62.
|
M. Francies
|
07.04.1962
|
CDC-I/Chennai
|
63.
|
S.
Kalyanasundaram
|
22.08.1959
|
Tiruvannamalai
EDC
|
64.
|
A. Gunasekaran
|
02.06.1959
|
NCTPS Stage-I
|
65.
|
P.S.
Venkateswaran
|
21.11.1959
|
GCC/
|
66.
|
G. Subramanian
|
01.12.1959
|
TTPS
|
Sd./- XXX
PERSONNEL OFFICER/ PANEL
F O R M A
T
Sl No.
1.
|
Name and
Designation
|
:
|
||
2.
|
Age and Date of Birth
|
:
|
||
3.
|
Educational Qualification/ Technical Qualification
|
:
|
||
4.
|
Date of Regular Appointment in the post of
|
:
|
Assistant Draughtsman Draughtsman
Senior Draughtsman
|
|
5.
|
Whether possess adequate knowledge in Tamil (Yes or No)
|
:
|
||
6.
|
Total service in the present post as on 20.01.2013
|
|||
7.
|
a)
|
Name of the Station and the circle in which now working
|
:
|
|
b)
|
The correct and complete office address of the Senior
Draughtsman
|
:
|
||
8.
|
Whether the Senior Draughtsman has acquired all the
qualifications prescribed in the Service Regulation or adhoc rules for the
higher post (Yes/ No)
|
:
|
||
9.
|
Whether any penalty has been imposed on the Senior Draughtsman for the last 5 years
and if so to furnish
|
|||
i)
|
The nature of charge
|
:
|
||
ii)
|
The nature of penalty imposed
|
:
|
||
iii)
|
Identify the charge whether proved or not proved
separately
|
:
|
10.
|
If the punishment ordered is stoppage of Increment with
or without cumulative effect, indicate the following
|
|||
i)
|
the normal due date of Increment of the Senior
Draughtsman
|
:
|
||
ii)
|
the date of commencement of the period of Punishment
|
:
|
||
iii)
|
the probable date of completion of the period of Punishment.
(A copy of final orders issued to be enclosed)
|
:
|
||
11.
|
Whether any Charge/Vigilance Enquiry are pending against Senior
Draughtsman and if so indicate the nature of Charge/Enquiry and its present
stage. A copy of Charge memo. to be enclosed.
|
:
|
||
12.
|
Whether he/she is on long leave/ unauthorized absence for
more than six months
|
:
|
||
13.
|
Whether suitable for promotion
|
:
|
SUPERINTENDING ENGINEER
No comments:
Post a Comment