TANGEDCO
(Administrative Branch)
8th Floor, NPKRR Maaligai,
144, Anna Salai, Chennai-2.
Memo.No. 009499/57/G14/G142/2014-1 , dated : 11.02.2014.
Sub : Estt.- Class III Service - Promotion
to the post of
Head Draughtsman
from the post of Senior Draughtsman
- Allotment orders - Issued.
Ref :
P.O./Panel's Memo.No. 054614/348/G3/G31/2013-5,
dated : 04.02.2014.
*****
Under Regulation 92 of Tamil Nadu Electricity Board Service Regulation, the following Senior Draughtsman who have been selected for
promotion to the post of Head Draughtsman in the reference cited are allotted
to the Circles/Stations mentioned against their names:
Sl.
No.
|
Name
of the Senior Draughtsman
|
Date
of Birth
|
Present
Circle
|
Allotted
Circle
|
(1)
|
(2)
|
(3)
|
(4)
|
(5)
|
1.
|
M.R.
Meera
|
12.12.1957
|
Chennai
EDC/ West
|
Chennai EDC/ West
|
2.
|
A. Amanullah
|
04.05.1960
|
Transmission-I/ Chennai
|
L.D.& G.O./Chennai
|
3.
|
K. Athikesavan
|
15.12.1959
|
Udumalpet EDC
|
Udumalpet EDC
|
4.
|
S. Rajendran
|
25.03.1959
|
GCC/ Trichy
|
C.D.C.-I/
Chennai
|
5.
|
K.N. Ramanathan
|
08.10.1962
|
M.T.P.P./ Stage-III
|
G.M./ HRD/
Chennai
|
6.
|
R. Dilly Ramesh
|
18.02.1959
|
T.T.P.S.
|
RE & I (D)/
Chennai
|
7.
|
N.A. Rafyee
|
30.04.1958
|
P&C/ Coimbatore
|
CE/D/ Coimbatore Region
|
8.
|
T. Ramamoorthy
|
15.05.1960
|
GCC-I/ Chennai
|
GCC-I/
Chennai
|
9.
|
B. Suthanthiram
|
09.05.1958
|
GCC/ Salem
|
Hydro (Electrical)/Chennai
|
10.
|
V. Anandan
|
09.02.1961
|
P&C/ Madurai
|
P&C/Madurai
|
11.
|
P. Vasanthakumar
|
18.06.1961
|
Kallakurichi EDC
|
Tiruvannamalai
EDC
|
12.
|
A. Moorthy
|
18.08.1959
|
Gen. Circle/ Kadamparai
|
G.C./Kadamparai
|
-2-
13.
|
S. Venkatraman
|
14.09.1961
|
Salem EDC
|
Namakkal EDC
|
14.
|
M. Sivakumar
|
08.03.1960
|
SE/Civil/ Hydro Project Circle/ Erode
|
Erode EDC
|
15.
|
M. Paramasivam
|
14.07.1961
|
P&C/ Coimbatore
|
Nilgiris EDC
|
16.
|
G. Gajendran
|
15.02.1960
|
GCC/ Salem
|
NCTPS-Stage I
|
17.
|
T. Mariappan
|
19.05.1959
|
SE/Civil/ Hydro Project Circle/ Erode
|
Civil Design/
Chennai
|
18.
|
S. Martin Devadoss
|
20.04.1961
|
GCC/Trichy
|
NCTPS Stage-II
|
2. They should await for further appointment and reposting
orders from the Superintending Engineers concerned and join duty in the station
to which they are posted or relinquish their rights for promotion, as per B.P.
Ms (FB) No.73(Adm.Branch) dt.14.9.1987 within 15 (Fifteen) days from the date
of receipt of orders of promotion as Head Draughtsman by them falling which it
will be construed that they are not willing to join as Head Draughtsman and the
order of promotion as Head Draughtsman will be cancelled.
4. The individuals mentioned in the Sl. No.1, 3,
8, 10, 11, 12, 13 and 14 are not
eligible for Transfer Travelling Allwance.
N. KRISHNAMOORTHI
CHIEF
ENGINEER/ PERSONNEL
To
The
Superintending Engineer/Chennai E.D.C./West
The
Superintending Engineer/Load Despatch & Grid Operation/Chennai
The
Superintending Engineer/Udumalpet Elecy.Distn.Circle
The
Superintending Engineer/Chennai Dev.Circle-lI/Chennai
The General
Manager/H.R.D./Chennai
The
Superintending Engineer/RE & I
(D)/Chennai
The Chief
Engineer/Distribution/Coimbatore Region.
The
Superintending Engineer/General Construction Circle-I/Chennai
The
Superintending Engineer/Hydro (Electrical)/Chennai
The
Superintending Engineer/P&C/Madurai
The
Superintending Engineer/Tiruvannamalai E.D.C.
The
Superintending Engineer/Gen.Circle/Kadamparai
The
Superintending Engineer/Namakkal E.D.C.
The
Superintending Engineer/Erode E.D.C.
The
Superintending Engineer/Nilgiris E.D.C.
The
Superintending Engineer/N.C.T.P.S.- Stage-I/Chennai
-3
–
The
Superintending Engineer/Civil Design/Chennai
The
Superintending Engineer/N.C.T.P.S.-Stage-II/Chennai
The Chief Engineer/Superintending Engineer concerned are requested to issue necessary reposting orders to the above individuals through the Superintending Engineers concerned. The date of joining of the individual may be reported to this office without fail.
Copy
to
The Superintending Engineer/Chennai E.D.C./West
The Superintending Engineer/Transmission-I/Chennai
The Superintending Engineer/Udumalpet E.D.C.
The Superintending Engineer/G.C.C./Trichy
The Superintending Engineer/M.T.P.P. Stage-III
The Superintending Engineer/T.T.P.S.
The Superintending Engineer/P&C/Coimbatore
The Superintending Engineer/GCC-I/Chennai
The Superintending Engineer/GCC/Salem
The
Superintending Engineer/P&C/Madurai
The
Superintending Engineer /Kallakurichi EDC
The
Superintending Engineer /Gen.Circle/Kadamparai
The Superintending Engineer/Salem
E.D.C.
The
Superintending Engineer/Civil/Hydro Project Circle/Erode
The Superintending Engineers concerned are requested to relieve the above individuals immediately on receipt of reposting orders from the concerned Chief Engineers/Superintending Engineers. The date of relief of the individual may be reported to this office without fail.
Copy to
The Chief Engineer/Distribution/Chennai
Region/South
The Chief
Engineer/Transmission/Chennai-2.
The
Chief Engineer/Distribution/Coimbatore Region
The Chief EngineerMettur Thermal Power Project
The Chief Engineer/Tuticorin Thermal Power Station
The Chief Engineer/Distribution/Madurai
Region.
The Chief Engineer/Distribution/Villupuram
Region
The Chief Engineer/Distribution/Erode
Region.
The
Chief Engineer/Hydro/Chennai.
The
Chief Engineer/North Chennai Thermal Power Station/Chennai
The
Personnel Officer/Panel, Adm.Branch/Chennai-2.
The
Personnel Officer/Staff Sanction/Adm.Branch/Chennai-2.
Copy
to Stock File.
:: FORWARDED :: BY ORDER ::
Sd./- XXX
No comments:
Post a Comment