TAMIL NADU GENERATION AND DISTRIBUTION
CORPORATION LTD.
ADMINISTRATIVE BRANCH
From
Er. A. RAJA, B.E.,
F.I.E.,
Chief Engineer/
Personnel,
8th Floor, NPKRR
Maaligai,
144, Anna Salai,
Chennai - 600 002.
|
To
The Superintending
Engineer/
|
Letter
No.036079/252/G3/G31/2013-2, dated
06.06.2013.
Sir,
Sub:
|
Establishment
- Class II Service - Head Draughtsman - Preparation of panel for promotion to
the post of Chief Head Draughtsman - suitability reports - called for - Regarding.
|
------
|
It is proposed to prepare a panel of
Head Draughtsman suitable for promotion to the post of Chief Head Draughtsman
to fill up the existing and future vacancies for the crucial date of
20.04.2013.
2. I am to request you to furnish 5
copies of the suitability report of the Head Draughtsman working under your
control (List of Names as per Annexure enclosed) in the FORMAT enclosed duly
signed by the Superintending Engineers concerned so as to reach this office ON
OR BEFORE 30.06.2013 positively. In this connection, I am to invite attention
to this office circular Memo. No.068288/Adm.II/A2/97-1, dated 12.06.1997 and
request you to keep up the target date.
3.
I am also to request you to furnish specifically the details regarding
the charges/ D.P. (framed/pendency/undergoing punishment) as on 20.04.2013
alongwith other details.
……2
-
2 -
4.
I am also to request you to furnish the particulars strictly, as called
for in the format. The letter number and the date in which format is enclosed
is also to be furnished in each copy of the format at the top. If any item of
the format having no remarks, that should be replied as "NIL" without
indicating as "DASH".
5.
If any of the employees shown in a particular circle, is not presently
working in your circle, a report may be sent without fail, indicating the
circle to which he has been transferred.
6.
The receipt of this letter together with its enclosures should be
acknowledged in the first instance.
Encl.:
Annexure & Format.
|
Yours faithfully,
Sd./-xxx
(R. MURALI)
PERSONNEL OFFICER/ PANEL
for CHIEF ENGINEER/ PERSONNEL
|
Copy
to the Chief Engineer/ Distribution/
Copy
to the Chief Engineer/
Copy
to the Assistant Personnel Officer/ M&C/ Adm. Branch
Copy
to G.15 Section.
Copy
to G.2 Section.
He is requested to furnish 5 copies of
the Performance Assessment Report in respect of 24 Nos. of Head Draughtsman
(List enclosed) early.
D:/popanel/g3/dm/dm-ltr
Annexure
to the Letter
No.036079/252/G3/G31/2013-2, dated
06.06.2013.
List of
Head Draughtsman for promotion to the post of Chief Head Draughtsman
Sl. No.
|
Name
|
D.O.B.
|
Present
Station
|
1.
|
Sundaramoorthy. C
|
13.06.1958
|
SE/ P&E/ Chennai
|
2.
|
Annai. P
|
01.09.1956
|
GCC-II/ Chennai
|
3.
|
Kannan. K
|
21.07.1955
|
Erode EDC
|
4.
|
Meganathan. A
|
21.11.1956
|
Nilgiris EDC
|
5.
|
Ravanan. S
|
01.04.1958
|
Perambalur EDC
|
6.
|
Selvam. K
|
25.01.1959
|
Salem EDC
|
7.
|
Vijayan. M
|
15.08.1956
|
CE/D/Coimbatore
|
8.
|
Mathiniraiselvan. G
|
03.05.1957
|
Tiruvannamalai EDC
|
9.
|
Asokan. G
|
05.09.1957
|
Tiruvannamalai EDC
|
10.
|
Ramanathan. V
|
20.05.1961
|
SE/LD & GO
|
11.
|
Ravichandran. S
|
01.07.1961
|
Mettur W.S.C.
|
12.
|
Josephraj. P
|
15.06.1955
|
Thanjavur EDC
|
13.
|
Kamatchi. S
|
20.06.1956
|
SE/P.D. & C
|
14.
|
Ranganathan. P
|
25.09.1961
|
Civil Designs
|
15.
|
Nagarajan. N
|
14.03.1959
|
GCC/ Chennai
|
16.
|
Muthuramalingam. S
|
23.03.1958
|
Valuthur GTPS
|
17.
|
Sundaram. M
|
11.04.1957
|
Ramnad EDC
|
18.
|
Santhakumaran. R
|
21.05.1956
|
Gen. Circle/ Kundah
|
19.
|
Saraswathy. N.L
|
24.03.1958
|
Chennai Dev. Circle-I
|
20.
|
Mayarajan. T
|
13.04.1959
|
Gen. Circle/ Tirunelveli
|
21.
|
Boobalan. V
|
08.02.1958
|
Thirupathur EDC
|
22.
|
Narasimhan. R
|
10.05.1956
|
CE/ Transmission
|
23.
|
Athikesavan. N.K
|
25.06.1958
|
Chennai EDC/ South
|
24.
|
Krishnaswamy. K
|
01.08.1956
|
Gen. Circle/ Kadamparai
|
Sd./-xxx
(R. MURALI)
PERSONNEL OFFICER/
PANEL
F O R M A T
Sl. No.
1.
|
Name and Designation
|
:
|
|
|
|
|
|
|
|
2.
|
Age and Date of
Birth
|
:
|
|
|
|
|
|
|
|
3.
|
Educational
Qualification/Technical Qualification
|
:
|
|
|
|
|
|
|
|
4.
|
Date of Regular
Appointment in the post of
|
:
|
Draughtsman :
Senior D’Man :
Head D’Man
:
|
|
|
|
|
|
|
5.
|
Whether possess
adequate knowledge in Tamil (Yes or No)
|
:
|
|
|
|
|
|
|
|
|
|
|
|
|
6.
|
Total service in
the present post as on 20.04.2013
|
:
|
|
|
|
|
|
|
|
7.
|
Name of the Station
and the circle in which now working
|
:
|
|
|
|
|
|
|
|
8.
|
Whether the Head
Draughtsman has acquired all the Qualifications prescribed in the Service
Regulation or Adhoc rules for the
higher post (Yes/No)
|
:
|
|
|
|
|
|
|
|
9.
|
Whether any penalty
has been imposed on the Head Draughtsman for the last 5 years and if so to
furnish
|
:
|
|
|
|
i.
|
The nature of
Charge
|
:
|
|
|
ii.
|
The nature of
penalty imposed
|
:
|
|
|
iii.
|
Identify the charge
whether proved or not proved separately
|
:
|
|
--2—
-2-
10.
|
If the punishment
ordered is stoppage of increment with or without cumulative effect indicate
the following
|
:
|
|
|
|
i.
|
the normal due date
of increment of the Head Draughtsman
|
:
|
|
|
ii.
|
the date of
commencement of the period of punishment
|
:
|
|
|
iii.
|
the probable date
of completion of the period of punishment
|
:
|
|
|
|
|
|
|
11.
|
Whether any
Charge/Vigilance enquiry are pending against the Head Draughtsman and if so
to indicate the nature of Charge/ enquiry and its present stage. A copy of
charge memo. to be enclosed
|
:
|
|
|
|
|
|
|
|
12.
|
Whether he/she is
on long leave/ unauthorized absence for more than six months
|
:
|
|
|
|
|
|
|
|
13.
|
Whether suitable
for promotion
|
:
|
|
SUPERINTENDING
ENGINEER
No comments:
Post a Comment