TAMIL NADU GENERATION AND DISTRIBUTION
CORPORATION LIMITED
(ABSTRACT)
Allowances
and Incentives – Revision of Payment of Remote Hydro/Cavern Allowance-cum
Performance Incentive for employees working in Remote Hydel Stations /
Kadamparai Power House- Orders – Issued.
------------------------------------------------------------------------------------------
(SECRETARIAT BRANCH)
(Per)
FB TANGEDCO Proceedings No.26, Dated the 3rd
May, 2012.
Chithirai, 21,
Thiruvalluvar Aandu-2043.
Read:
1) (Per) B.P. (FB) No.23 (SB), dt.20-3-2002.
2) (Per) B.P. (Ch) No.223
(SB) dt.21-11-2009.
3) (Per) B.P. (Ch) No.224
(SB) dt.21-11-2009.
4) Minutes approved by the 24th
meeting of the
TANGEDCO held on 23-4-2012.
-----
PROCEEDINGS:-
In
the Board’s Proceedings first cited, orders have been issued for payment of
Remote Hydro / Cavern Allowance-cum-Performance Incentive to the employees
working in Remote Hydel Stations.
While allowing the above allowance, the Hydro areas have been divided
into four categories for the purpose of sanction of Remote Hydro Allowance
based on their relative remoteness, climatic condition and other available
facilities such as Medical, Educational and Communication. The Remote Hydro Allowance was sanctioned at
the following rate against each category:-
Category
|
Rate
|
Category – I
|
20% of Basic Pay
|
Category-II
|
15% of Basic Pay
|
Category-III
|
10% of Basic Pay
|
Category-IV
|
Nil
|
The Cavern Allowance was sanctioned
to the employees working in Kadamparai Power House at the rate of 10% of Basic
Pay since it is located in a Cavern.
… 2 …
:: 2 ::
2)
Revision of wages was ordered with effect from 1-12-2007 and the
Revision of Allowances/Special Pay was given effect to from 1-9-2009 to the
employees / Officers as in the reference second and third
cited. But, the
Remote Hydro / Cavern Allowance-cum-Performance Incentive was not
revised. It has been represented to
revise the Remote Hydro / Cavern Allowance-cum-Performance Incentive to the
employees working in the Hydro Generation areas.
3)
After careful consideration, the
TANGEDCO hereby revise the Remote Hydro / Cavern Allowance-cum-Performance
Incentive in the Revised Pay at the following rates against each category as in
the Annexure with effect from 1-9-2009:-
Category
|
Rate
|
Category – I
|
20% of Basic Pay + Grade Pay
|
Category-II
|
15% of Basic Pay + Grade Pay
|
Category-III
|
10% of Basic Pay + Grade Pay
|
Category-IV
|
Nil
|
4) The Cavern Allowance shall also be sanctioned
at the rate of 10% of Basic Pay + Grade Pay in the Revised Pay to the employees
working in Kadamparai Power House and Pykara Ultimate Stage Hydro Electric
Project (PUSHEP). The other conditions
for payment of revised Remote Hydro / Cavern Allowance-cum-Performance
Incentive as ordered in the Board’s Proceedings first cited remains
unaltered.
5) The Arrears of Remote Hydro /
Cavern Allowance-cum-Performance Incentive for the period from 1-9-2009 to
30-4-2012 (32 months) may be paid in two
equal monthly instalments as shown below:-
i)
1st instalment in June 2012
ii) 2nd
instalment in July 2012.
6) The expenditure sanctioned in para-3 above
shall be debited to “TANGEDCO Funds – Revenue Expenses – 75.408 – Salaries –
Other Allowances – Remote Hydro/Cavern Allowance-cum-Performance Incentive.
7)
The receipt of the Board’s Proceedings shall be acknowledged.
(BY ORDER OF THE BOARD)
A.S. PASUPATHI
SECRETARY.
To
The Chief Engineer/Hydro/Chennai.
All Chief Engineers.
The Chief Financial Controller/General and
Revenue/TANGEDCO.
… 3 ..
:: 3 ::
The Chief Financial Controller/TANTRANSCO.
All Superintending Engineers.
All Deputy Secretaries/Secretariat Branch.
The Chief Internal Audit Officer/Audit Branch.
The Residential Audit Officer.
Copy to:-
The Chairman
cum Managing Director's Table.
The Managing
Director/TANTRANSCO.
All
Directors/TANGEDCO and TANTRANSCO.
The Inspector
General of Police/Vigilance.
The
Secretary / TANGEDCO / Chennai-2.
The
Legal Adviser.
The
Addl. Chief Engineer/Chairman cum Managing Director’s office.
The
Industrial Relations Adviser/TANGEDCO.
The
Chief Medical Officer/Head Quarters Dispensary/Chennai.2.
The
Deputy Chief Engineer/Administrative Branch.
All
Senior Personnel Officers/Administrative Branch.
The
Industrial Relations Officer/TANGEDCO.
The
Director, Computer Centre.
The
Assistant Personnel Officer/Tamil Development – for Publication
in the TNEB Bulletin (2 copies).
The
Director/Tamil Nadu Electricity Board Printing Press.
All
Branches.
All
Officers/Sections/Cells in the Secretariat Branch .
Tamil
Nadu Electricity Workers' Federation.
Tamil
Nadu Electricity Board Accounts & Executive
Staff Union.
Tamil
Nadu Electricity Board Workers Progressive Union (LPF).
Central
Organisation of Tamil Nadu Electricity Employees (COTEE).
Minsara
Pirivu Anna Thozhir Sangam.
Tamil
Nadu Minvariya Janatha Thozhilalar Sangam.
Tamil
Nadu National Electricity Workers' Federation (2 Groups).
Tamil
Nadu Electricity Board Engineers' Sangam.
Tamil
Nadu Electricity Employees Congress.
Tamil
Nadu Electricity Board Thozhilalar Aykiyya Sangam.
Tamil
Nadu Electricity Board Engineers' Association.
Tamil
Nadu Electricity Board Finance & Accounts Officers Association.
Bharathiya
Electricity Employees Federation.
Tamil
Nadu Electricity Board Card Billing Staff Union.
Tamil
Nadu Electricity Board Dr.Ambedkar Employees Union.
All
other signatory Unions.
:: TRUE COPY :: FORWARDED :: BY ORDER ::
SECTION OFFICER.
p.t.o. for Annexure
ANNEXURE
- I
LIST OF
AREAS ELIGIBLE FOR REMOTE HYDRO/CAVERN ALLOWANCE
Sl.No.
|
Category
|
Hydro Stations
|
Rates
|
i)
|
Category-I
|
Upper
Bhavani Pump House, Parsons Valley, Porthimund, Pykara Power House, Kundah
Power House. V & VI, Sholayar Power House-I, PUSHEP, Kadamparai, Kadamparai Power House, Kodayar
Power House-I, Kodayar Upper Camp, Kuttiar Pump House, Highway Camp and Camps
and Quarters, Dams, Valve House, Forebays and Guest Houses relating to these
Power Houses.
|
20%
|
ii)
|
Category-II
|
Avalanche,
Emerald, Sandinallah, Glenmorgan, Moyar Power House, Singara Power House,
Maravakandy Power House, Masinagudi Camp, Kundah Power House-II to IV,
Mukurthi Mini Power House, Sholayar Power House-II, Upper Aliyar Camp
including Punachi Power House, Kodayar Power House-II, Kodayar Lower Camp,
Eravangalar, Vanniar, Manalar, Servalar Power House and Camps and Quarters,
Dams, Valve Houses, Forebays and Guest Houses relating to these Power Houses.
|
15%
|
iii)
|
Category-III
|
Kundah-I, Pykara Micro Hydel Power House, Kundah
Bridge Camp and Central Office, Athikadavu Camp, Aliyar Power House,
Sarkarpathi Power House, Attakaatti Camp and Central Office, Periyar Power
House, Suruliyar Power House, Papanasam Power House, Sathanur Power House and
Camps and Quarters relating to these Power Houses, Dams, Valve Houses,
Forebays and Guest Houses relating to these Power House.
|
10%
|
:: 2 ::
Sl.
No.
|
Category
|
Hydro Stations
|
Rates
|
iv)
|
Category-IV
|
1)
SE/Gen/Erode Office
2)
SE/Gen/Tirunelveli Office
3)
Barrage PH-I to IV.
4)
Mettur Dam and Mettur Tunnel PHs.
5)
Vaigai Dam Micro Hydel.
6)
Lower Bhavani RBC.
7)
Thirumurthy Mini Power House.
|
Nil
|
//
TRUE COPY //
No comments:
Post a Comment